EPC-LS: Gas trunk pipeline between the Cabiunas compression station and REDUC III (Duque de Caxias Refinery), Package 1, 104 km of Ø 38″ – steel pipe API 5LX70 (PSL2), for interconnecting such station with SDV-12. The project also includes the erection of surface facilities, fiber optic laying and interconnection with SCADA System. Construction, Procurement, Detail engineering, Commissioning, Erection.
Country: Brazil
Type: Pipeline
Name: Cabiúnas Gas Pipeline – REDUC ( GASDUC III)
Customer: PETROBRAS SA
Completion Year: 2010