EPC-LS: La Garita Pipeline, with a total length of 123.23 Km and diam. 12″. Facilities include: Limon Pump Station, Siguierres and Turrialba Booster Stations, Storage tank farm and connections, booster pump system, filtration and metering system, main pumping system with 6 x 1,250 HP each electrical driven pumps and 3 x 1,500 HP each electrical driven pumps, pressure control system, SCADA system, electric system, cathodic protection system, buildings, civil works and auxiliary systems.
Country: Costa Rica
Type: Pipeline
Name: III Stage of the Limon – La Garita Pipeline
Customer: RECOPE
Completion Year: 2008