EPC-LSTK: Construction of pipelines to transfer gas from the Hawiyah plant to the existing plants in Uthmaniyah and Shedgum and construction of Hawiyah and Haradh’s manifolds, with a total length of 604 km of Ø 24” to 56” for new lines and the conversion of an existing 150 km. long oil pipeline from crude to gas in order to transport gas to Riyadh’s Thermal Stations.
Country: Saudi Arabia
Type: Pipeline
Name: Hawiyah Gas Development Pipelines
Customer: Saudi Aramco
Completion Year: 2001