EPC-LSTK: Electrical interconnection between Uruguay and Brazil in two sections. Section from San Carlos to Melo, 283 km in 500 kV/50 Hz; and section from Melo to the Brazilian border, 65 Km in 525 kV / 60 Hz. The project also includes a FO telecommunication system of approx. 6 Km.
Country: Uruguay – Brazil
Type: Power Generation and Transmission
Name: Uruguay/Brazil High Power Transmission Line 500 kV
Customer: UTE-Usinas y Transmisiones Electricas de Uruguay.
Completion Year: 2014