{"id":148,"date":"2020-08-05T17:36:53","date_gmt":"2020-08-05T17:36:53","guid":{"rendered":"http:\/\/atfprojects.com\/es\/?p=148"},"modified":"2020-08-05T17:36:53","modified_gmt":"2020-08-05T17:36:53","slug":"nuevo-sistema-de-suministro-de-agua-para-la-ciudad-de-guayaquil","status":"publish","type":"post","link":"https:\/\/atfprojects.com\/es\/nuevo-sistema-de-suministro-de-agua-para-la-ciudad-de-guayaquil\/","title":{"rendered":"Nuevo sistema de suministro de agua para la ciudad de Guayaquil"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">EPC-LS: Elaboraci\u00f3n de Ingenier\u00eda de detalle, suministro de materiales y equipos, construcci\u00f3n de la tuber\u00eda de agua: Marginal del Salado (7,40 km y \u00d8 1.500, 1.200 y 900 mm), Eloy Alfaro &#8211; D. Comin (5,96 km y \u00d8 600 y 400 mm), Guasmo Oeste (4,75 km y \u00d8 1.000 mm).&nbsp;Construcci\u00f3n de interconexiones de 29,8 km de tubos de hierro d\u00factil para Sistema de Distribuci\u00f3n y 175 km de tubos de PVC (10 atm).&nbsp;Provisi\u00f3n e instalaci\u00f3n de 12 medidores de flujo.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pa\u00eds<\/strong>&nbsp;: Ecuador<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Tipo:<\/strong>&nbsp;Infraestructura y obra p\u00fablica<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Nombre<\/strong>&nbsp;: Nuevo sistema de suministro de agua para la ciudad de Guayaquil<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Cliente<\/strong>&nbsp;: EPAP-G<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>A\u00f1o de finalizaci\u00f3n:<\/strong>&nbsp;1994<\/p>\n","protected":false},"excerpt":{"rendered":"<p>EPC-LS: Elaboraci\u00f3n de Ingenier\u00eda de detalle, suministro de materiales y equipos, construcci\u00f3n de la tuber\u00eda de agua: Marginal del Salado (7,40 km y \u00d8 1.500, 1.200 y 900 mm), Eloy Alfaro &#8211; D. Comin (5,96 km y \u00d8 600 y &hellip; <a href=\"https:\/\/atfprojects.com\/es\/nuevo-sistema-de-suministro-de-agua-para-la-ciudad-de-guayaquil\/\">Continuar<\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-148","post","type-post","status-publish","format-standard","hentry","category-proyectos-destacados"],"_links":{"self":[{"href":"https:\/\/atfprojects.com\/es\/wp-json\/wp\/v2\/posts\/148","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/atfprojects.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/atfprojects.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/atfprojects.com\/es\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/atfprojects.com\/es\/wp-json\/wp\/v2\/comments?post=148"}],"version-history":[{"count":1,"href":"https:\/\/atfprojects.com\/es\/wp-json\/wp\/v2\/posts\/148\/revisions"}],"predecessor-version":[{"id":149,"href":"https:\/\/atfprojects.com\/es\/wp-json\/wp\/v2\/posts\/148\/revisions\/149"}],"wp:attachment":[{"href":"https:\/\/atfprojects.com\/es\/wp-json\/wp\/v2\/media?parent=148"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/atfprojects.com\/es\/wp-json\/wp\/v2\/categories?post=148"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/atfprojects.com\/es\/wp-json\/wp\/v2\/tags?post=148"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}