{"id":150,"date":"2020-08-05T17:38:02","date_gmt":"2020-08-05T17:38:02","guid":{"rendered":"http:\/\/atfprojects.com\/es\/?p=150"},"modified":"2020-08-05T17:38:02","modified_gmt":"2020-08-05T17:38:02","slug":"desarrollo-de-la-cuenca-de-petroleo-muglad","status":"publish","type":"post","link":"https:\/\/atfprojects.com\/es\/desarrollo-de-la-cuenca-de-petroleo-muglad\/","title":{"rendered":"Desarrollo de la cuenca de petr\u00f3leo Muglad"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">EPC-LSTK: Proyecto de desarrollo de petr\u00f3leo en la cuenca de Muglad.&nbsp;Marsa Bashir Onshore &amp; Offshore Marine Terminal (30 km al sur de Puerto Sud\u00e1n), suministro e instalaci\u00f3n de v\u00e1lvulas, tanques de almacenamiento (capacidad total 2,000,000 bbl, 5 tanques de 400,000 bbl cada uno), seis estaciones de bombeo para 1500 km de tuber\u00eda, trampas de env\u00edo y recepci\u00f3n, tanques de descarga, SCADA y sistemas de comunicaci\u00f3n, sistema contra incendios, protecci\u00f3n cat\u00f3dica, edificios, galp\u00f3n dep\u00f3sito, laboratorio, sala de control, 1500 km de cable de fibra \u00f3ptica, etc.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pa\u00eds<\/strong>&nbsp;: Sud\u00e1n<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Tipo:<\/strong>&nbsp;Infraestructura y obra p\u00fablica<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Nombre<\/strong>&nbsp;: Desarrollo del aceite de la cuenca de Muglad<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Cliente<\/strong>&nbsp;: Greater Nile Petroleum Operating Company Ltd.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>A\u00f1o de finalizaci\u00f3n:<\/strong>&nbsp;2000<\/p>\n","protected":false},"excerpt":{"rendered":"<p>EPC-LSTK: Proyecto de desarrollo de petr\u00f3leo en la cuenca de Muglad.&nbsp;Marsa Bashir Onshore &amp; Offshore Marine Terminal (30 km al sur de Puerto Sud\u00e1n), suministro e instalaci\u00f3n de v\u00e1lvulas, tanques de almacenamiento (capacidad total 2,000,000 bbl, 5 tanques de 400,000 &hellip; <a href=\"https:\/\/atfprojects.com\/es\/desarrollo-de-la-cuenca-de-petroleo-muglad\/\">Continuar<\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-150","post","type-post","status-publish","format-standard","hentry","category-proyectos-destacados"],"_links":{"self":[{"href":"https:\/\/atfprojects.com\/es\/wp-json\/wp\/v2\/posts\/150","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/atfprojects.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/atfprojects.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/atfprojects.com\/es\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/atfprojects.com\/es\/wp-json\/wp\/v2\/comments?post=150"}],"version-history":[{"count":1,"href":"https:\/\/atfprojects.com\/es\/wp-json\/wp\/v2\/posts\/150\/revisions"}],"predecessor-version":[{"id":151,"href":"https:\/\/atfprojects.com\/es\/wp-json\/wp\/v2\/posts\/150\/revisions\/151"}],"wp:attachment":[{"href":"https:\/\/atfprojects.com\/es\/wp-json\/wp\/v2\/media?parent=150"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/atfprojects.com\/es\/wp-json\/wp\/v2\/categories?post=150"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/atfprojects.com\/es\/wp-json\/wp\/v2\/tags?post=150"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}