{"id":197,"date":"2020-08-05T18:06:19","date_gmt":"2020-08-05T18:06:19","guid":{"rendered":"http:\/\/atfprojects.com\/es\/?p=197"},"modified":"2020-08-05T18:06:20","modified_gmt":"2020-08-05T18:06:20","slug":"desarrollo-de-gasoductos-hawiyah","status":"publish","type":"post","link":"https:\/\/atfprojects.com\/es\/desarrollo-de-gasoductos-hawiyah\/","title":{"rendered":"Desarrollo de Gasoductos Hawiyah"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">EPC-LSTK: Construcci\u00f3n de tuber\u00edas para transmisi\u00f3n de &nbsp;gas desde la planta de Hawiyah a las plantas existentes en Uthmaniyah y Shedgum, y construcci\u00f3n de colectores Hawiyah y Haradh, con una longitud total de 604 km de \u00d8 24\u201da 56\u201d para nuevas l\u00edneas y la conversi\u00f3n de un oleoducto existente de 150 km de largo de crudo a gas para transportar gas a las Estaciones T\u00e9rmicas de Riad.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pa\u00eds<\/strong>&nbsp;: Arabia Saudita<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Tipo:<\/strong>Ttuber\u00eda<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Nombre<\/strong>&nbsp;: Desarrollo de Gasoductos Hawiyah<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Cliente<\/strong>&nbsp;: Saudi Aramco<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>A\u00f1o de finalizaci\u00f3n:<\/strong>&nbsp;2001<\/p>\n","protected":false},"excerpt":{"rendered":"<p>EPC-LSTK: Construcci\u00f3n de tuber\u00edas para transmisi\u00f3n de &nbsp;gas desde la planta de Hawiyah a las plantas existentes en Uthmaniyah y Shedgum, y construcci\u00f3n de colectores Hawiyah y Haradh, con una longitud total de 604 km de \u00d8 24\u201da 56\u201d para &hellip; <a href=\"https:\/\/atfprojects.com\/es\/desarrollo-de-gasoductos-hawiyah\/\">Continuar<\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-197","post","type-post","status-publish","format-standard","hentry","category-proyectos-destacados"],"_links":{"self":[{"href":"https:\/\/atfprojects.com\/es\/wp-json\/wp\/v2\/posts\/197","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/atfprojects.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/atfprojects.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/atfprojects.com\/es\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/atfprojects.com\/es\/wp-json\/wp\/v2\/comments?post=197"}],"version-history":[{"count":1,"href":"https:\/\/atfprojects.com\/es\/wp-json\/wp\/v2\/posts\/197\/revisions"}],"predecessor-version":[{"id":198,"href":"https:\/\/atfprojects.com\/es\/wp-json\/wp\/v2\/posts\/197\/revisions\/198"}],"wp:attachment":[{"href":"https:\/\/atfprojects.com\/es\/wp-json\/wp\/v2\/media?parent=197"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/atfprojects.com\/es\/wp-json\/wp\/v2\/categories?post=197"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/atfprojects.com\/es\/wp-json\/wp\/v2\/tags?post=197"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}