Loops TGS
EC – LS: Construction of parallel gas pipelines (loops) for a total length of 277 km of diam. 36″, including surface facilities Country: Argentina Type: Pipeline Name: Loops TGS Customer: Odebrecht S.A. Completion Year: 2008
EC – LS: Construction of parallel gas pipelines (loops) for a total length of 277 km of diam. 36″, including surface facilities Country: Argentina Type: Pipeline Name: Loops TGS Customer: Odebrecht S.A. Completion Year: 2008
EC – LS: Construction of parallel gas pipelines (loops) for a total length of 348.5 km of diameters 24″, 30″ and 36″, including supply of surface facilities Country: Argentina Type: Pipeline Name: Loops TGN (Phases I & II) Customer: Odebrecht … Continued
EPC-LSTK: Pipeline of 107 km/24“ parallel to the existing gasline of Ø18”, from Pampa Melchorita to Chilca. The works include six intermediate blocking valves, pressure control station in Melchorita, scraper traps and replacing of 2,300 m/18” close to Chincha. Country: … Continued
Country: Canada Type: Pipeline Name: Clipper ProjectTransportation System Customer: Enbridge Pipeline Inc. Completion Year: 2009
LS: Camisea Maintenance Contract. – Maintenance services for pumping stations, pipelines, existing surface facilities, access roads and ROW maintenance through geotechnical works, camp services for the Camisea gas pipelines project. The works also involve maintenance of shelters and optic fiber … Continued
EPC-LSTK: Construction of a 408 km of diam. 34” gas pipeline and its related surface facilities, which is split in two sections, Central and West. The gas pipeline starts at the future compression station (CS2) in Chiquintirca and ends at … Continued
EPC-LS: Gas trunk pipeline between the Cabiunas compression station and REDUC III (Duque de Caxias Refinery), Package 1, 104 km of Ø 38″ – steel pipe API 5LX70 (PSL2), for interconnecting such station with SDV-12. The project also includes the … Continued
EC-LS: RTR water pipeline from Tanajib to Manifa Central Processing Facilities; 60 km of diam. 18”. Country: Saudi Arabia Type: Pipeline Name: Tanajib Water Line Customer: JGC Corporation Completion Year: 2011
EPC-LS: Construction of a gas pipeline from the Client’s dock on Paraná de las Palmas river, close to Escobar city, where the LNG ships operate, to feed the TGN trunk lines close to Cardales location, with a total length of … Continued
EPC-LS: Construction of pipelines and one loop for a total length of 72 Km. The scope of services includes engineering, procurement and construction of pipelines of 8”, 10”, 20”, 24” y 28” and its related surface facilities. Gathering line (GTS): … Continued