Pesqueria Green Field Plant
C-LS: Construction of a cold lamination plant in a 437 ha surface. Country: Ecuador Type: Industrial Plant Name: Pesqueria Green Field Plant Customer: Ternium Mexixo SA de CV Completion Year: 2013
C-LS: Construction of a cold lamination plant in a 437 ha surface. Country: Ecuador Type: Industrial Plant Name: Pesqueria Green Field Plant Customer: Ternium Mexixo SA de CV Completion Year: 2013
EPC-LS: Multiproduct Pipeline System including 128 km of 10″ pipeline from Libertad to Pascuales, 275 km of 10″ pipeline from Pascuales to Santo Domingo, 178 km of 6″ pipeline from Libertad to Manta, 10 API steel storage tanks of 100,000 … Continued
EPC-LSTK: Products pipeline from Enugu via Makurdi to Yola, 685 km of Ø 8” – Steel Pipe API-5L-X-60, including major river crossings, incorporating pumping stations, metering system, scraper launcher / receivers, instrumentation, civil works and storage tanks for a total … Continued
EPC-LSTK: Construction of pipelines to transfer gas from the Hawiyah plant to the existing plants in Uthmaniyah and Shedgum and construction of Hawiyah and Haradh’s manifolds, with a total length of 604 km of Ø 24” to 56” for new … Continued
EPC-LS: Engineering, procurement and construction of the Brandsen-Campana pipeline of 165 km and diam. 22”. Includes 22,000 m3/day storage tanks, pumping system and SCADA. Country: Argentina Type: Pipeline Name: Brandsen-Campana Oil Pipeline Customer: Oiltanking Ebytem SA Completion Year: 2002
EPC-LS: San Fernando Project. 114,3 km long gas pipeline of Ø 36″ between Reynosa and San Fernando in the state of Tamaulipas, including 2 compressor stations for a total capacity of 46,350 HP each, comprising three Turbo compressors of 11,521 … Continued
EPC-LSTK: OCP Project. Crude oil pipeline transportation system of 503 km of Ø 24″, 32″, 34″ and 36″ which includes storage facilities for 1,200,000 bbl, 4 pumping stations, two reducing stations, onshore terminal comprising 5 crude storage tanks of 750,000 … Continued
EPC-LSTK: Camisea Project consisting of two parallel lines for gas and LNG transportation, 711 km of Ø 32″, 24″, 18″ and 595 km of Ø 12″, 10″. Including valves, metering, 2 reduction and 4 pumping stations, scraper traps, etc. Country: … Continued
EPC-LS: Construction of three sections of loops on the trunk gas pipeline for a total length of 56 km of 30″ diam. Section 1, 19 km long, is located near Catriel, in the prov. of Rio Negro. Section 2, 22 … Continued
EPC-LS: Water pipeline from Pichi Mahuida to Santa Rosa City, 2 pumping stations, 1 potable water plant, main control building and ancillary facilities. Two 132 Kava-transforming stations. 2 water tanks of 2,550 & 7,500 m3, SCADA control system and radio … Continued